Single-commit clean baseline after security scrub of niche-tells, project codenames, internal jargon, and contributor-email leaks. Contents: - 100 Rust crates (_primitives/_rust/) - 37 agent manifests (_manifests/) + generated specs (_generated/) - 67 user-invocable skills (skills/) - 33 hooks (hooks/) - Composition blocks (_blocks/) - Documentation (docs/, README.md) - TS adapter packages (_ts_packages/) - Assembler (_assembler/) - Roles (_roles/) - Templates (_templates/) - Forgejo CI (.forgejo/) Author: Denis Parfionovich <info@greendragon.info> License: see LICENSE.
3.7 KiB
Phase 6 — Handoff + Final Report
Goal: emit a single, complete report and (optionally) hand off to
/web-deployor/auth-setup. No further mutation to the VM from this skill. Verify criterion: final report emitted; all Phase-1..5 artefacts listed with absolute paths; next-skill dispatch (if any) announced.
6.a — Artefact ledger
Collect and surface:
<run-dir>/plan.md— Phase 2<run-dir>/cloud-init.yaml— Phase 3 input<run-dir>/firewall-intent.yaml— Phase 2 source of truth<run-dir>/harden.log— Phase 4 stderr<run-dir>/post-harden.txt— Phase 4 systemctl snapshot<run-dir>/sshd_config+sshd_config.d/— Phase 5 input (captured)<run-dir>/ufw-status.txt— Phase 5 input (captured)<run-dir>/ssh-check.json— Phase 5 output<run-dir>/firewall-diff.json— Phase 5 output
Every path must exist on disk before emitting the report. Missing artefact = bug in an earlier phase; STOP and surface the gap.
6.b — Final report
=== /VM-PROVISION REPORT ===
Intent: <first 80 chars of INTENT>
Provider: <PROVIDER> / region=<REGION> / plan=<PLAN> / arch=<ARCH>
VM: <VM_NAME> @ <VM_IP>
Admin: <ADMIN_USER> (ssh port <SSH_PORT>)
Ports: <APP_PORTS joined>
TLS: <TLS_HOST or "none">
Hardened: <HARDENED>
Verification: ssh-check=PASS firewall-diff=PASS
Handoff: <HANDOFF_TO>
Artefacts:
- <run-dir>/plan.md
- <run-dir>/cloud-init.yaml
- <run-dir>/firewall-intent.yaml
- <run-dir>/harden.log
- <run-dir>/post-harden.txt
- <run-dir>/sshd_config (+ sshd_config.d/)
- <run-dir>/ufw-status.txt
- <run-dir>/ssh-check.json
- <run-dir>/firewall-diff.json
AskUserQuestion count: <N, should be ≥ 6>
No prose after the ledger. The report is the contract.
6.c — Handoff (no AskUserQuestion; next-skill dispatch inferred)
If TLS_HOST was set AND the caller's intent mentions deploying an app
— dispatch to /web-deploy with the VM IP and admin credentials
(by env-var reference only, RULE 0.8). Surface:
Handoff → /web-deploy <VM_IP> --admin <ADMIN_USER> --tls <TLS_HOST>
If the intent mentions auth / identity — surface:
Handoff → /auth-setup <VM_IP>
Otherwise: HANDOFF_TO=none. User invokes the next skill manually when
ready.
Never run the next skill automatically — the user already clicked their way through 6 phases; handing off to another multi-phase skill without a pause is hostile UX.
6.d — Memory save (RULE memory-protocol)
Append to memory/{project-or-infra}.md:
### VM provisioned: <VM_NAME> (YYYY-MM-DD) [E1]
- Provider: <PROVIDER> <PLAN> @ <REGION>
- IP: <VM_IP>
- Admin: <ADMIN_USER>
- Hardened: harden-base.sh rev <git-sha>
- Verify: ssh-check + firewall-diff both PASS
- Cost: <X>/month (cited @ <date>)
- Artefacts: <run-dir>/
Evidence grade E1 — facts are direct observations (we ran the commands, we have the exit codes, we can re-verify on demand).
If the project file doesn't exist yet, create memory/{slug}.md and add
a single line to MEMORY.md under the right section.
6.e — Verify criterion
- Report emitted.
- All 9+ artefacts exist on disk at absolute paths.
memory/{project}.mdupdated (or created) with the provision entry.HANDOFF_TOannounced (ornone).
6.f — Rollback instructions (always include in the report)
# destroy the VM + all its resources (idempotent)
_primitives/provision-<PROVIDER>.sh destroy <VM_NAME> --force
# purge local artefacts (plan, logs, captured configs)
rm -rf <run-dir>
Keep them visible — Future-Us will appreciate the 1-command path back.