Single-commit clean baseline after security scrub of niche-tells, project codenames, internal jargon, and contributor-email leaks. Contents: - 100 Rust crates (_primitives/_rust/) - 37 agent manifests (_manifests/) + generated specs (_generated/) - 67 user-invocable skills (skills/) - 33 hooks (hooks/) - Composition blocks (_blocks/) - Documentation (docs/, README.md) - TS adapter packages (_ts_packages/) - Assembler (_assembler/) - Roles (_roles/) - Templates (_templates/) - Forgejo CI (.forgejo/) Author: Denis Parfionovich <info@greendragon.info> License: see LICENSE.
2.3 KiB
Schema Locks — REVOKED
Revoked on: 2026-04-23
Revoked by: user (explicit request "Мы проекты за часы делаем — недели abstraction")
Replaces: docs/SCHEMA-LOCKED.md and docs/AGENT-SCHEMA-LOCKED.md
Revocation rationale
Both schema locks (atom substrate v1 and agent substrate v1) were originally declared for calendar windows:
- Atom substrate: 6 weeks (through 2026-06-03)
- Agent substrate: 3 weeks (through 2026-05-14)
Reality check: the phases those locks were intended to protect shipped in hours, not weeks:
- Atom substrate phases 1-5 (4 parallel streams + integration) — landed in ~2 hours
- Agent substrate phases 1-5 — landed in ~30 minutes
- Convergence pre-unlock wave (U1+U2+U3) — landed in ~25 minutes
The locks were calibrated for a timeline that was 30-100× slower than actual execution. Calendar-week windows are corporate-ritual pacing, not real-velocity pacing. Keeping the locks would delay breaking consolidations (path-filter merge, cargo-green merge, /audit target, verb-template refactor) that can now safely ship.
What revocation enables
Immediate (post-revocation, in-flight wave):
- Verb templates (CRUD as data) — Layer A from convergence plan
- Schema fragments ($ref'd JSON) — Layer B
- PatternGate unified trait — Layer C
- CommandVerify unified trait — Layer D
- Role expression (extends/adds/relaxes) — Layer E
- DNA identity — new Layer G (agent ID encodes composition)
Follow-up:
scope::path-filter(consolidate whitelist + denylist)quality::cargo-green(consolidate check + tests)/audit <target>(collapse 6 skills + checklist registry)- kei-runtime-core extraction (shared infrastructure across 3+ runtime crates)
What stays locked (nothing)
Neither SUBSTRATE-SCHEMA.md nor AGENT-SUBSTRATE-SCHEMA.md is locked. Breaking changes allowed from this commit forward with standard review gate (audit agents + integration tests pass).
Process change
Future schema-lock declarations:
- Express duration in agent-hours-of-work, not calendar weeks
- Default: "locked until explicitly revoked OR all declared-dependent phases land"
- Revocation requires: ledger row + reason + this doc updated
No more calendar-week locks.
Ledger entry
2026-04-23 schema_lock_revoked atom,agent reason=calendar-overestimate,phases-landed