Group G — markdown tech-debt cleanup (post-audit 2026-05-02).
- 36 SKILL.md files: added "## When to use" section. Was missing across the
catalog; orchestrator routing by keyword could not auto-dispatch.
- 20 code-implementer agent .md files: added Output Footer block prescribing
RULE 0.16 STATUS-TRUTH MARKER schema in agent's final report. Previously only
code-implementer-rust.md had it; other 27 language/role variants were silent
about the marker, breaking RULE 0.16 §3 status-truth aggregation for non-Rust
batches.
- skills/site-create/: added phase-5-preview.md and phase-6-deploy.md skeleton
files. SKILL.md table-of-contents referenced 7 phases; only 5 existed on disk.
- skills/{ai-animation,rag-pipeline}/skill.md: added migration banner comment
noting they should be SKILL.md (canonical filename). Case-rename via git is a
separate orchestrator task (macOS APFS is case-insensitive; Linux deploy needs
explicit rename).
- 3 deprecated skills (site-builder, competitor-analysis, design-inspiration):
added concrete removed-after dates (was vague "before v2").
- docs/CONVERGENCE-PLAN.md:129: TBD on _blocks/evidence-grading.md duplicate
resolved (file exists, not duplicated).
- docs/DNA-INDEX.md: count edits made then overwritten by auto-encyclopedia-refresh
hook during agent run. The .kei-registry-ignore files in test fixtures (Group F)
are the structural fix; kei-registry walker implementation is the follow-up.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
69 lines
1.8 KiB
Markdown
69 lines
1.8 KiB
Markdown
# Phase 6 — Production Deploy
|
|
|
|
> Goal: deploy the approved site to production and verify it is live.
|
|
> **Verify criterion:** production URL responds 200; deploy commit recorded;
|
|
> user notified with live URL and summary report.
|
|
|
|
---
|
|
|
|
## 6.a — Run production deploy
|
|
|
|
Invoke the production deploy target:
|
|
|
|
```
|
|
/web-deploy --env production
|
|
```
|
|
|
|
The deploy skill handles:
|
|
- Final build (`npm run build`)
|
|
- Upload / push to the configured hosting target (Vercel, Netlify, CF Pages,
|
|
S3+CDN, VPS via rsync, etc.)
|
|
- DNS propagation check (waits up to 60 s for the apex domain to resolve)
|
|
|
|
---
|
|
|
|
## 6.b — Post-deploy smoke test
|
|
|
|
After the deploy reports success, verify the live URL:
|
|
|
|
1. HTTP HEAD on the production URL → expect `200 OK`.
|
|
2. Check `<title>` tag matches the project name from Phase 0.
|
|
3. If a sitemap was generated in Phase 4, verify `<domain>/sitemap.xml` returns 200.
|
|
|
|
If any check fails: report to user; do NOT mark phase complete.
|
|
|
|
---
|
|
|
|
## 6.c — One AskUserQuestion: final confirmation
|
|
|
|
Present the live URL and smoke-test results. Ask:
|
|
|
|
- **Done — mark pipeline complete** — proceed to exit report.
|
|
- **Issue found — rollback** — invoke `/web-deploy --rollback` to the
|
|
previous production snapshot.
|
|
|
|
---
|
|
|
|
## 6.d — Exit report
|
|
|
|
Emit the pipeline completion summary:
|
|
|
|
```
|
|
=== SITE-CREATE PIPELINE COMPLETE ===
|
|
Project: <project-name>
|
|
Live URL: <production-url>
|
|
Phases: 0-6 all complete
|
|
Sections: <N> locked (mock-render)
|
|
Audits: <a11y / seo / responsive / perf findings applied>
|
|
Deploy: <hosting target> — <deploy ID or commit SHA>
|
|
```
|
|
|
|
---
|
|
|
|
## 6.e — Verify criterion
|
|
|
|
- Production URL live and smoke-tested (200 OK, correct `<title>`).
|
|
- Deploy commit or deploy ID recorded in exit report.
|
|
- User confirmed pipeline complete.
|
|
|
|
Pipeline ends here.
|